首页

翻译以下此段?

1、 HS proposal for plot plan was handed over to Hualu. Comments to plot plan to be given after receipt of flow sheets. 2、 After this date zero date will be agreed upon. 3、 HS will be able to inform finally delivery date after clients approval of the related equipment drawings in the 3 rd lot. 4、 Due to the large number special wishes for the form of the documentation 5、 Documents for both lines are required at this stage. By the agreed time of delivery for each document package HTAS will send by courier service a list of the documents contained in the package with indication of the e- mail issue dates. The courier receipt and copy of the list will be valid for the payment on the L/C. After the last package has been sent HTAS will issue the required hardcopies and CD’s. 6、 Typical drawings of the ammonia converter and loop equipment were reviewed. Hualu had no comments to the drawings. 7、 proposal for plot plan was handed over to Hualu. Comments to plot plan to be given after receipt of flow sheets. The available area available is: Loop 95 x 40 meter, Compressor building: 95 x 24 meter. 显示全部
1人参与回答
,销售 2018-05-18回答
请标出疑难点,以便更好地得到帮助。
 
 
这是一条消息提示
 
提醒
您好,您当前被封禁天,这天内您将不能登陆盖德问答,离解封时间还有
我已了解
提醒
提问需要5个能量值,您当前能量值为,请完成任务提升能量值
去查看任务