请帮忙翻译一下 谢谢? 2)technical services and engineering review 技术服务与工程设计资料会审 (3)insulation clips will be provided on equipment which will require insulation. insulation itself will be in client’s scope 需要保温的设备上将配备保温固定卡子。保温工作本身由用户负责。 (1)module and off skid vessels installation and field foundations. 分体或整体容器的滑动安装和其现场基础。 (4)fabrication labor required for the modularized system as shown in the schematic flow diagrams b- 002-4107. 对单元化系统所需的劳力,见示意流程图b-002-4107。查看更多