每天一句翻译1? during the performance test the actual totaltoday’s cost has to be calculated with the above method from the actualmeasured utilities’ consumption. the minimum performance limit (guaranteed value) for utilities is 110% of the above mentioned tstc-value. 在业绩测试的时候 实际每天的总消耗用上面的方法(实际衡量公共事业的消费)来计算 公共事业的最低业绩限度(保底值)是上面提到的tstc-值的1.1倍。查看更多