turnkey总承包是不是就是EPC总包? 回复 6# 智者明 而且,根据这个定义,你这个performace test相当于完成单机调试啊,联机和投料都没开始。 at this point, the turnover system or facility, as applicable, will be ready for commissioning and startup, including the introduction of hydrocarbons into the facility.查看更多