一篇英文变更,都搞不定,请教了? new location of tt043004shall be at least 10 x d downstream of tv043003.a in order to minimize impact caused by thermal conduction. 为了减少热传导影响,现在tt043004安装位置距tv043003.a的位置知道10dn(应该是管道的工程直径),并且在tv043003.a的下游, for visualisation of above mentioned recommendation please see attached sketch. 具体情况参考附件中的简图 (see attached file: pfp4302_recommendation-tt043004.pdf) 见文件pfp4302_recommendation-tt043004.pdf in order to ease operation and reduce efforts for operators it is strongly recommended to adjust the design as shown in our sketch. 为了便于操作,我们强烈建议安装简图所示调整设计查看更多