have in place procedures covering performance怎么理 ...? the project engineering manager shall ensure that all design conducted by 3rd parties (e.g. vendors, sub contractors etc) is accurate and correct. 我想这句话的翻译是:“项目经理需要确保所有的设计由三方《供应商,分包商等》组成是精确无误的” 3rd parties who are required to perform design work have in place procedures covering performance, checking and verification of engineering design which conform to the requirements of quality plan. 需要完成设计工作的三方,要在封面设计,检查,符合质量设计要求的项目设计核查几方面有建树。查看更多