急!求教一段外方资料? 向大家求助,这段话的翻译。 其中DCU 是延迟焦化。 Flare Load Summary Tables Gas and liquid flow rates, operating conditions and applicable physical properties of all streams to be routed to the flare or blow down systems shall be tabulated for each failure and each safety relief valve. The load summary tables shall include all causes of emergency failures throughout the DCU. Additionally, for flare unit, process flow diagrams indicating molecular mass (weight), density, pressure, temperature and phase for the various nodes shall be provided. 查看更多1个回答 . 1人已关注