这段话怎么翻译? epc contractor shall keep document that required by owner during project execution, and turnover all project documents that is outlined in this attachment to owner at each defined step. each type of turnover will be coordinated by discipline and there should be a coordinator for each of the following sections within epc contractor assigned to manage this process as applicable. the type of documentation shall be turned over are as follows. 总包商需要根据业主要求,在整个项目执行中(妥善)保管项目文件,并在指定的阶段移交相应的可交付文件。 epc公司内部需要有协调专员(项目工程师)管理和协商合理的工作流程,并与各专业商定其交付目录。 可交付文件的种类(大项)如下:查看更多