一份十分详细的管道静压测试流程? 坛子上pdf的文件发不上来,只好给个链接了, http:///ifp/hydrotestgui.pdf 里面有很详细的管路静压试验说明 最近也搞了个这方面的资料翻译 但是由于搜集的资料不全 对管路静压试验了解不够透彻 所以我想就这份资料里面几处问题向大家讨教: 1. often a 10 cycle pressurization test is most desirable to confirm good soundness. then the measurements are taken in the last pressurization. prior pressurization cycles in a cyclic test many use holds at pressure for 10 minutes or more 这里hold是否可以理解为“保压”?(maintain a pressure ) 2. if the system is not flanged or otherwise fitted to permit tying in with standard fittings, 这里tie in with 是否理解为"接合“? 3. if possible the pressure test gage should be located at the centerline elevation-of the lowest pipe in this particaular system. if the test gage must be at a higher location, the test pressure must be decreased for this difference in head. head我注意了很久 但是这里不知道该做何解?查看更多