lng接收站码头,提供加油加淡水服务吗?否则哪儿补给呢 ...? The 36” LNG unloading line carry the LNG from the LNG Dock to the LNG Storage Tank (TK-1) over a length of approximately 1,050 feet. The LNG transfer line will be vacuum jacket insulated and the pipe material will be Stainless Steel ASTM 304L. No ship bunkering facilities will be provided at the Curacao marine terminal. Neither ship stores supply, ship fresh water supply, ship bilge water handling, nor ship sewage disposal will be provided at the marine terminal. Secured access between 查看更多0个回答 . 2人已关注