请帮忙翻译一下 谢谢? 2)technical services and engineering review 技术服务和工程的审查 (3)insulation clips will be provided on equipment which will require insulation. insulation itself will be in client’s scope 在需要隔热的设备上提供隔热夹套。 隔热本身将在业主的范围。 (1) module and off skid vessels installation and field foundations. 设备单元及撬装的安装和现场基础建设 (4)fabrication labor required for the modularized system as shown in the schematic flow diagrams b- 002-4107. 构建物需要有模型来展示,在下列图表中b-002-4107。查看更多