求大神翻译句子,急!!? shop and/or module fabrication lead time is to be subtracted from the work area ras dates and determine the latest possible fabrication start, isometric issue date and material availability required at the shop and module fabrication premises. 车间ras日期需要扣除采购和/或组件预制的交货时间,该时间取决于预制可以开始的最早时间、轴测图出图时间和材料到位时间。 自己也不太搞得明白,云里雾里了。查看更多