balance it by changed the value 如何理解(物料平衡)? Description of the problem(装置设计方向工艺许可方提的问题): On Appendix of your technical proposal, overall material balance, the value of Product A should be 160 KTA instead of 205 KTA. If this, there is 4 KTA difference between feed and product. It maybe balance it by changed the value of waste water or fuels. Note(许可方回复): A modified Material Balance is attached. 请教标红句的含义(或翻译)? 查看更多6个回答 . 1人已关注