请帮忙翻译一下 谢谢? (2)technical services and engineering review 技术服务与工程审查 (3)insulation clips will be provided on equipment which will require insulation. insulation itself will be in client’s scope 需要绝缘的设备上将配备绝缘夹。绝缘体属于用户(工作)范围。 (1)module and off skid vessels installation and field foundations. 模块与撬块外容器 的安装及现场基础。 (4)fabrication labor required for the modularized system as shown in the schematic flow diagrams b- 002-4107. 示意流程图b-002-4107上所示模块化系统所需的 装配人工 。查看更多