继续发问 hardware/ Pending? 初步接触翻译。真是耗脑力。 独学而无友,则孤陋寡闻。感谢大家的帮助。 拿捏不准的文字,请帮忙。 transports are loaded Supply pump centrifugal All flanges will be RF CL 150 weld neck or slip on flanges. To include all mounted hardware , piping, valves All other piping 2” and below will either be socket welded or threaded, pending assembly and maintenance requirements. The proposal for this application is for an activated carbon pressure swing adsorption Vapour Recovery Unit (VRU). One (1) vertical packed absorption column, carbon steel vessel fabrication, designed for the intended service conditions, including internal components , and at a minimum , 1 barg pressure and 65° C. 查看更多8个回答 . 5人已关注
CS3000的几个组态下装的区别? 大家好,我刚接触CS3000不久,对一些基本知识不太熟悉,想请教大家一些问题,主要为CS3000中有很多下装,区别是什么,什么时候要用到某个下装,那些下装可以在线进行,那些不行? System View中Load中: 1、Download Project Common Section 2、Download To IOM 3、Download To HIS 4、Download To Tag-list 5、Download Status Display File 6、Off-line Download to BCV 7、Download Tag-list/Gateway Information 8、Save BCV Operation Mark 9、Download To CGW 10、Download Common Block 查看更多1个回答 . 5人已关注